Product Details
Premade ready installed steel structure workshops with wall and roof kits
Some Precautions:
Anti-seep:
How to prevent the house seepage when it rains? One thing we need to understand is that rain water enters the metal roof through lap joints or nodes, so to prevent seepage, it must be blocked in this regard. How to do it? It is necessary to use a sealing washer at the screw port and adopt a hidden fixation. Use a sealant or welding at the overlap of the board. It is best to use a long board to eliminate the overlap. The swelling at various nodes is tightly waterproofed.
Fire protection:
The steel structure will not catch fire, and even if a fire occurs, the metal roofing material will not burn, so there is no need to worry too much about the fire protection ability.
Moisture proof:
The steel structure workshop can be filled with thermal insulation cotton in the metal roof layer, and the metal roof bottom plate is covered with a waterproof membrane. The metal roof panel has ventilable nodes.
Lightning protection:
Lead the lightning to the ground to prevent the lightning from penetrating the metal roof and entering the room.